Aspen C90 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Silnik Aspen C90. Aspen Checklist - Gateway Yachts Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 6
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Aspen C90 Operating Checklists
This Quick Reference checklist is a condensed checklist. It assumes that the operator is experienced
and competent in the safe operation of a power boat of this size, is knowledgeable of boating rules and
regulations, and has read the more detailed Aspen operating notes and the Aspen Owner’s Manual.
These notes do not attempt to anticipate every situation or occasion that may arise, and are not a
substitute for reading the Owner’s Manuals and other informational materials which are located on
the boat, or for exercising reasonable care and good judgment in the handling and operation of the
boat.
Quick start & Daily Operating Procedure Checklist
Upon Boarding:
Power panel: activate 12 volt DC buses and any equipment needed prior to engine start.
(Caution do not turn on Hot Water Tank unless it has water in it)
First Thing Each Day:
Check engine oil, check engine compartment for general condition & lack of fumes.
Check cooling water handle (vertical), check cooling fluid level, check dripless shaft seal fluid.
If cold and/or has not been run in several days, prime fuel by pressing plunger until firm.
Check position of main power switches. Four switches on, center transfer switch off.
Check fuel tank levelsensure you have sufficient fuel for trip plus adequate reserves.
Check water & holding tank indicator. Fill with potable water if needed, pump waste if needed.
Are all portholes closed and secure?
Turn off anchor light or turn on Nav lights as needed.
Starting Engines:
Turn off non-essential items disconnect external power (dock Circuit Breaker switch off first).
Throttle/Shifter in “neutral(pulled out position), crack throttle slightly if needed.
Turn key to “on” position; wait for engine instruments to come on.
Turn Blower on.
Momentarily move key to “Start” position.
Check for rise in oil pressure.
Post Start:
Turn on required/desired DC electrical items, nav lights, refrigerator, heater if needed.
Turn on navigation equipment.
Turn on radio, monitor ch. 16 or marina frequency (Cap Sante = 66).
Gateway Yachts Adventure Yachting Excellence…
Przeglądanie stron 0
1 2 3 4 5 6

Podsumowanie treści

Strona 1

Aspen C90 Operating Checklists This Quick Reference checklist is a condensed checklist. It assumes that the operator is experienced and competent

Strona 2

“Quickstart” / Daily Operating Checklist Continued Preparing to Leave the Dock: ☐ All lines clear of propeller and secured so they cannot fall in

Strona 3

“Quickstart” / Daily Operating Checklist Continued Mooring at Anchor: ☐ Prep windlass by moving red tab to unlock winch. ☐ Anchor is lowered from pu

Strona 4 - Checklists

Non- Normal Checklists Non-normal situations are where systems knowledge and preparation pay off. In any potential emergency situation, the skippe

Strona 5

Electrical Smoke or Fire: Fires can progress rapidly if a fuel source is present. If a fire develops and cannot quickly be extinguished, consideratio

Strona 6

Unintentional Grounding/ Submerged Log Strike: Sticking to known deep water, generally in the middle of the channel is the best way to ensure an in

Komentarze do niniejszej Instrukcji

Brak uwag